Sydney Metro West – Eastern Tunneling Package

CJC Management - Sydney Metro West - Eastern Tunneling Package Project

Overview Sydney Metro West works is across three key packages to construct the civil tunnels and shafts of the metro. The Eastern Tunnelling Project is the section from The Bays to Hunter Street CBD, with the line running through Pyrmont. It also includes the construction of the station boxes at Pyrmont and Hunter Street in […]

Central West Pumped Hydro

CJC Management - Central West Pumped Hydro

Overview The Central West Pumped Hydro ECI involved design, planning and pricing the construction of a 325MW electrical generation and storage facility, with the ability to generate 2,600MWh of energy and provide power to more than 153,000 homes.​ ​ The project included the design of access roads and water supply infrastructure, upper and lower reservoirs, […]

Western Harbour Tunnel and Beaches Link

CJC Management - Western Harbour Tunnel and Beaches Link, hero image

Overview The Western Harbour Tunnel will connect to WestConnex at the Rozelle Interchange, cross under Sydney Harbour between the Birchgrove and Waverton areas and connect with the Warringah Freeway at North Sydney. As part of the project, the Warringah Freeway Upgrade will make the road safer and more efficient. This project is valued at $12.5 […]

Sydney Metro

CJC Management - Sydney Metro under Construction

Overview The Skytrain takes the Sydney Metro above ground for four kilometres, between Kellyville and Rouse Hill, is between 10-13m above ground level and is supported by 112 concrete piers.​ The project is valued at $12.5 billion. CJC’s Role CJC’s responsibilities included expert advice on the pre-cast concrete operations, construction of the cable stayed bridge […]

M7 Widening and M12 Interchange

CJC Management - M7 Widening and M12 Interchange project

Overview The project includes the widening of 23km of the M7 Motorway between Richmond Road and the M5 Motorway and the construction of a new interchange to connect to the proposed M12 Motorway. Works included the widening of over 40 bridge structures, several of which were similar in structure type to the Commonwealth Ave Bridges.  […]

Inland Rail Grade Separating Road Interfaces

Scope The Australian Rail Track Corporation (ARTC) Inland Rail project is the upgrade of the freight rail network from Melbourne to Brisbane via Victoria, New South Wales, and Queensland.   As part of the Inland Rail Grade Separation Program, Transport for NSW is currently investigating the grade separation of 22 sites where existing highways interface […]

Great Western Highway

Scope Transport for New South Wales has engaged CJC Management to provide constructability advice to the Great Western Highway Upgrade East Project. The Project is made up of two sections, namely Katoomba to Medlow Bath and Medlow Bath to Blackheath.  It is understood that the current intention is for the K2M and M2B sections to […]

Dubbo Airport Northern RPT Apron Extension

Scope The scope of the project includes an extension of the existing apron adjacent to Bay 1 to create a new aircraft parking position and includes additional infrastructure changes to accommodate storm water drainage, aeronautical ground lighting and floodlighting. CJC is supporting the Dubbo Airport team in preparing tender documentation and will also likely provide on-site […]

Sydney Airport Civil Assets

Scope CJC Management were engaged by Sydney Airport Corporation Limited to develop a Civil Assets Manual, provide ad-hoc friction testing training, and technical advisory services across the entire airfield. A further document which covers Friction Management at the Airport was requested as part of the scope. This included training and induction into friction management activities. […]