Hunter Power Project

Overview The Hunter Power Project is a critical state significant infrastructure project and includes the design and construction of a 660MW gas fired power station. The power station comprises of two heavy-duty, open cycle gas turbines. The turbines will be able to operate on natural gas and hydrogen and provide critical firming energy infrastructure for […]
Project Energy Connect

Overview The high voltage electricity interconnector, collectively known as EnergyConnect, involves the design and construction of high voltage transmission lines from the South Australian border to Wagga Wagga, 710 kilometres in length, major substation construction at Buronga and Dinawan and station upgrades at Wagga Wagga and Red Cliffs. CJC worked as part of the pre-contracts […]