Project Energy Connect

CJC Management- Project Energy Connect, SA & NSW

Overview The high voltage electricity interconnector, collectively known as EnergyConnect, involves the design and construction of high voltage transmission lines from the South Australian border to Wagga Wagga, 710 kilometres in length, major substation construction at Buronga and Dinawan and station upgrades at Wagga Wagga and Red Cliffs. CJC worked as part of the pre-contracts […]

Olympic Highway Intersection Upgrades

Scope The Olympic Highway through Wagga Wagga provides an important regional and local link from suburbs north of the Murrumbidgee River, Bomen Freight Hub and Charles Sturt University to services in Wagga Wagga via the two-lane, two-way Gobbagombalin Bridge.   Traffic growth as a result of increased land development to the north of Wagga Wagga […]

Download PDF

Fill in the form below to download your copy of our General Capability Statement.

General Capability Form