Stockton Bridge Half Joint Rehabilitation

Scope Stockton Bridge is located over the north arm of the Hunter River, near Newcastle in NSW. Built in 1971, it is a concrete box girder bridge with an overall length of 1,023m. In 2007, the bearings were replaced in the two half-joints and monitoring of the structure has continued since. From 2016, a design […]

Download PDF

Fill in the form below to download your copy of our Rail Capability Statement.

Rail Capability Form

Download PDF

Fill in the form below to download your copy of our General Capability Statement.

General Capability Form