Central West Pumped Hydro

CJC Management - Central West Pumped Hydro

Overview The Central West Pumped Hydro ECI involved design, planning and pricing the construction of a 325MW electrical generation and storage facility, with the ability to generate 2,600MWh of energy and provide power to more than 153,000 homes.​ ​ The project included the design of access roads and water supply infrastructure, upper and lower reservoirs, […]

West Gate Tunnel Melbourne

CJC Management - West Gate Tunnel, Melbourne

Overview The West Gate Tunnel Project will deliver a vital alternative to the West Gate Bridge, providing a much needed second river crossing, quicker and safer journeys and remove thousands of trucks from residential streets. CJC’s role encompasses several key roles and responsibilities as part of the Surface Works Delivery including Senior Delivery Director, Commercial, […]

Brisbane Airport

CJC Management - Brisbane Airport

Overview The Brisbane Airport project involved the design, construction, operation and maintenance associated with the upgrade of the existing Baggage Handling System for both the International and Domestic Terminals to cater for new security requirements. CJC’s Role CJC Management was engaged to provide specialist advisory services for the tender phase of the works, this included […]

Sydney Metro Northwest

CJC Management - Sydney Metro Northwest

Overview A 4km elevated rail viaduct culminating in a 270m curved cable stay bridge, constructed from pre-cast concrete segments and placed with 2 overhead gantries. Works also included 2 large cuttings and station platforms.​ The project is valued at $12.5 billion. CJC’s Role Provision of a multi-disciplinary team across all areas of construction. In particular, […]

Sydney Metro

CJC Management - Sydney Metro under Construction

Overview The Skytrain takes the Sydney Metro above ground for four kilometres, between Kellyville and Rouse Hill, is between 10-13m above ground level and is supported by 112 concrete piers.​ The project is valued at $12.5 billion. CJC’s Role CJC’s responsibilities included expert advice on the pre-cast concrete operations, construction of the cable stayed bridge […]

Project Energy Connect

CJC Management- Project Energy Connect, SA & NSW

Overview The high voltage electricity interconnector, collectively known as EnergyConnect, involves the design and construction of high voltage transmission lines from the South Australian border to Wagga Wagga, 710 kilometres in length, major substation construction at Buronga and Dinawan and station upgrades at Wagga Wagga and Red Cliffs. CJC worked as part of the pre-contracts […]