Mascot Tunnels Mechanical and Electrical (M&E) Upgrade

Scope RMS (now TfNSW) upgraded the existing electrical supply and utilities within the Mascot Tunnel complex along General Holmes Drive, underneath the Sydney Airport north-south runway and taxiways. The upgrade consists of works on both eastbound and westbound tunnels. RMS engaged CJC to undertake a constructability assessment on three concept design options for the upgrade […]

M6 Extension Stage 1

Scope The M6 Extension Stage 1 project will provide a motorway standard link between the New M5 at Arncliffe and the existing M1 Princes Motorway at Loftus. It will connect St George, Sutherland Shire and the Illawarra regions to the Sydney Motorway network.   The 3.8km section provides the critical link to the major gateways […]

Great Western Highway, NSW

Scope Transport for New South Wales has engaged CJC Management to provide constructability advice to the Great Western Highway Upgrade East Project. The Project is made up of two sections, namely Katoomba to Medlow Bath and Medlow Bath to Blackheath.  It is understood that the current intention is for the K2M and M2B sections to […]

Stockton Bridge Half Joint Rehabilitation

Scope Stockton Bridge is located over the north arm of the Hunter River, near Newcastle in NSW. Built in 1971, it is a concrete box girder bridge with an overall length of 1,023m. In 2007, the bearings were replaced in the two half-joints and monitoring of the structure has continued since. From 2016, a design […]

Sydney Harbour Bridge Arch Maintenance Units (AMU)

Scope RMS (now TfNSW) is proposing the replacement of the four existing Arch Maintenance Units (AMU) on the Sydney Harbour Bridge. The dated AMUs are to be replaced with new infrastructure consisting of two cranes at each end that span between the top chords of the bridge.   The works are needed to provide safe […]

Dubbo Airport Northern RPT Apron Extension

Scope The scope of the project includes an extension of the existing apron adjacent to Bay 1 to create a new aircraft parking position and includes additional infrastructure changes to accommodate storm water drainage, aeronautical ground lighting and floodlighting. CJC is supporting the Dubbo Airport team in preparing tender documentation and will also likely provide on-site […]

Newell Highway Pilliga Widening

Scope The NSW Government has committed $8.8 million to develop design concepts for the widening of the Newell Highway between Coonabarabran and Narrabri through the Pilliga – known as the Pilliga Widening project. This project will ultimately reduce travel times, improve journey reliability and improve safety along the Newell Highway for road users. A Construction […]

Sydney Airport Civil Assets

Scope CJC Management were engaged by Sydney Airport Corporation Limited to develop a Civil Assets Manual, provide ad-hoc friction testing training, and technical advisory services across the entire airfield. A further document which covers Friction Management at the Airport was requested as part of the scope. This included training and induction into friction management activities. […]

Download PDF