Sydney Metro West – Central Tunnelling Package

Overview Sydney Metro West includes the construction of twin 11-kilometre metro railway TBM tunnels from The Bays to Sydney Olympic Park and excavation and civil works for five new stations at The Bays, Five Dock, Burwood North, North Strathfield and Sydney Olympic Park. The project is valued at $2 billion. CJC’s Role CJC was engaged […]
Hunter Power Project

Overview The Hunter Power Project is a critical state significant infrastructure project and includes the design and construction of a 660MW gas fired power station. The power station comprises of two heavy-duty, open cycle gas turbines. The turbines will be able to operate on natural gas and hydrogen and provide critical firming energy infrastructure for […]
West Gate Tunnel Melbourne

Overview The West Gate Tunnel Project will deliver a vital alternative to the West Gate Bridge, providing a much needed second river crossing, quicker and safer journeys and remove thousands of trucks from residential streets. CJC’s role encompasses several key roles and responsibilities as part of the Surface Works Delivery including Senior Delivery Director, Commercial, […]
Brisbane Airport

Overview The Brisbane Airport project involved the design, construction, operation and maintenance associated with the upgrade of the existing Baggage Handling System for both the International and Domestic Terminals to cater for new security requirements. CJC’s Role CJC Management was engaged to provide specialist advisory services for the tender phase of the works, this included […]
Sydney Metro Northwest

Overview A 4km elevated rail viaduct culminating in a 270m curved cable stay bridge, constructed from pre-cast concrete segments and placed with 2 overhead gantries. Works also included 2 large cuttings and station platforms. The project is valued at $12.5 billion. CJC’s Role Provision of a multi-disciplinary team across all areas of construction. In particular, […]
Sydney Metro

Overview The Skytrain takes the Sydney Metro above ground for four kilometres, between Kellyville and Rouse Hill, is between 10-13m above ground level and is supported by 112 concrete piers. The project is valued at $12.5 billion. CJC’s Role CJC’s responsibilities included expert advice on the pre-cast concrete operations, construction of the cable stayed bridge […]
Inland Rail Grade Separating Road Interfaces

Scope The Australian Rail Track Corporation (ARTC) Inland Rail project is the upgrade of the freight rail network from Melbourne to Brisbane via Victoria, New South Wales, and Queensland. As part of the Inland Rail Grade Separation Program, Transport for NSW is currently investigating the grade separation of 22 sites where existing highways interface […]
Osborne Naval Shipyard Project

Scope Infrastructure development at the Osborne Naval Shipyard aims to modernise ship construction systems and processes in Australia to improve shipyard productivity and reduce the cost of Australian build programs. CJC personnel undertook constructability assessments of the proposed car park, pedestrian footbridge and wharf facilities. Following engagement of a subcontractor for these works, CJC undertook […]
Easing Sydney’s Congestion M4 Smart Motorway Stage 3

Scope The NSW Government is investing $470 million to build the M4 Smart Motorway project which includes a 35km upgrade along the M4 Motorway from Lapstone to Mays Hill. When complete, the project will provide a tailored technology solution to create a better travelling experience for motorists and a more consistent journey. Smart Motorways […]
WestConnex Stage 1A M4 Widening

Scope WestConnex Stage 1 M4 Widening involved building an additional lane in each direction on the M4 Motorway, between Parramatta and Homebush. The project is approximately 7.5km long. The responsibilities of our team included implementation of risk management project controls, project preparation and readiness, interface management with utilities providers and stakeholders, review of the design against […]
Sydney Yard Access Bridge

Scope The Sydney Yard Access Bridge project was the first early and enabling works package of the NSW Government’s Sydney Metro City & Southwest project. The 130m long bridge crosses five intercity lines that had never been closed under a single possession. While a full closure was planned, the main girders and cross girders were […]
Sydney Airport Civil Assets

Scope CJC Management were engaged by Sydney Airport Corporation Limited to develop a Civil Assets Manual, provide ad-hoc friction testing training, and technical advisory services across the entire airfield. A further document which covers Friction Management at the Airport was requested as part of the scope. This included training and induction into friction management activities. […]