Central West Pumped Hydro

CJC Management - Central West Pumped Hydro

Overview The Central West Pumped Hydro ECI involved design, planning and pricing the construction of a 325MW electrical generation and storage facility, with the ability to generate 2,600MWh of energy and provide power to more than 153,000 homes.​ ​ The project included the design of access roads and water supply infrastructure, upper and lower reservoirs, […]

Hunter Power Project

CJC Management - Hunter Power Project

Overview The Hunter Power Project is a critical state significant infrastructure project and includes the design and construction of a 660MW gas fired power station. The power station comprises of two heavy-duty, open cycle gas turbines. The turbines will be able to operate on natural gas and hydrogen and provide critical firming energy infrastructure for […]

Brisbane Airport

CJC Management - Brisbane Airport

Overview The Brisbane Airport project involved the design, construction, operation and maintenance associated with the upgrade of the existing Baggage Handling System for both the International and Domestic Terminals to cater for new security requirements. CJC’s Role CJC Management was engaged to provide specialist advisory services for the tender phase of the works, this included […]

The Transport Access Program (TAP)

CJC Management - Transport Access Program

Overview Provide temporary works design to support The Transport Access Program (TAP) in delivering a better experience for public transport customers across NSW by providing accessible, modern, secure and integrated transport. CJC’s Role CJC’s design team was engaged as the sub-consultant to main consultant, Arcadis in the design of temporary works for the construction of […]

Project Energy Connect

CJC Management- Project Energy Connect, SA & NSW

Overview The high voltage electricity interconnector, collectively known as EnergyConnect, involves the design and construction of high voltage transmission lines from the South Australian border to Wagga Wagga, 710 kilometres in length, major substation construction at Buronga and Dinawan and station upgrades at Wagga Wagga and Red Cliffs. CJC worked as part of the pre-contracts […]

M7 Widening and M12 Interchange

CJC Management - M7 Widening and M12 Interchange project

Overview The project includes the widening of 23km of the M7 Motorway between Richmond Road and the M5 Motorway and the construction of a new interchange to connect to the proposed M12 Motorway. Works included the widening of over 40 bridge structures, several of which were similar in structure type to the Commonwealth Ave Bridges.  […]

Bluff Bridge Crossing Upgrade

CJC Management - Bluff Bridge Crossing Upgrade Hero Image

Overview  CJC Management Services developed and delivered the structural design and documentation for the new Bluff Bridge over the Orara River. This project replaces the existing timber road bridge that was built in circa 1905 and is nearing the end of its service life, which was prone to frequent flooding, with a modern Super T-Girder […]

King Georges Road Stage 1

Scope The proposed Project, King Georges Road Stage 1 (KGR Stage 1), will generally involve widening a 1.2 kilometre length of King Georges Road to provide three lanes in each direction, improving drainage and improving safety through construction of median and wire rope barrier to separate northbound and southbound traffic. As part of the scope, […]

M6 Extension Stage 1

Scope The M6 Extension Stage 1 project will provide a motorway standard link between the New M5 at Arncliffe and the existing M1 Princes Motorway at Loftus. It will connect St George, Sutherland Shire and the Illawarra regions to the Sydney Motorway network.   The 3.8km section provides the critical link to the major gateways […]

Great Western Highway

Scope Transport for New South Wales has engaged CJC Management to provide constructability advice to the Great Western Highway Upgrade East Project. The Project is made up of two sections, namely Katoomba to Medlow Bath and Medlow Bath to Blackheath.  It is understood that the current intention is for the K2M and M2B sections to […]

Osborne Naval Shipyard Project

Scope Infrastructure development at the Osborne Naval Shipyard aims to modernise ship construction systems and processes in Australia to improve shipyard productivity and reduce the cost of Australian build programs. CJC personnel undertook constructability assessments of the proposed car park, pedestrian footbridge and wharf facilities. Following engagement of a subcontractor for these works, CJC undertook […]

Stockton Bridge Half Joint Rehabilitation

Scope Stockton Bridge is located over the north arm of the Hunter River, near Newcastle in NSW. Built in 1971, it is a concrete box girder bridge with an overall length of 1,023m. In 2007, the bearings were replaced in the two half-joints and monitoring of the structure has continued since. From 2016, a design […]

Download PDF

Fill in the form below to download your copy of our General Capability Statement.

General Capability Form