M6 Extension Stage 1

Scope The M6 Extension Stage 1 project will provide a motorway standard link between the New M5 at Arncliffe and the existing M1 Princes Motorway at Loftus. It will connect St George, Sutherland Shire and the Illawarra regions to the Sydney Motorway network.   The 3.8km section provides the critical link to the major gateways […]

Inland Rail Grade Separating Road Interfaces

Scope The Australian Rail Track Corporation (ARTC) Inland Rail project is the upgrade of the freight rail network from Melbourne to Brisbane via Victoria, New South Wales, and Queensland.   As part of the Inland Rail Grade Separation Program, Transport for NSW is currently investigating the grade separation of 22 sites where existing highways interface […]

WestConnex Stage 1A M4 Widening

Scope WestConnex Stage 1 M4 Widening involved building an additional lane in each direction on the M4 Motorway, between Parramatta and Homebush. The project is approximately 7.5km long. The responsibilities of our team included implementation of risk management project controls, project preparation and readiness, interface management with utilities providers and stakeholders, review of the design against […]

Sydney Yard Access Bridge

Scope The Sydney Yard Access Bridge project was the first early and enabling works package of the NSW Government’s Sydney Metro City & Southwest project. The 130m long bridge crosses five intercity lines that had never been closed under a single possession. While a full closure was planned, the main girders and cross girders were […]

Dubbo Airport Northern RPT Apron Extension

Scope The scope of the project includes an extension of the existing apron adjacent to Bay 1 to create a new aircraft parking position and includes additional infrastructure changes to accommodate storm water drainage, aeronautical ground lighting and floodlighting. CJC is supporting the Dubbo Airport team in preparing tender documentation and will also likely provide on-site […]

Sydney Airport Civil Assets

Scope CJC Management were engaged by Sydney Airport Corporation Limited to develop a Civil Assets Manual, provide ad-hoc friction testing training, and technical advisory services across the entire airfield. A further document which covers Friction Management at the Airport was requested as part of the scope. This included training and induction into friction management activities. […]

Download PDF

Fill in the form below to download your copy of our General Capability Statement.

General Capability Form