Peter is a chartered Civil Engineer with over eight years’ industry experience in projects ranging from $200,000 to $800 million. He has a proven track record in Australia and the United Kingdom (UK) with Tier 1 Contractors.
Peter has extensive experience delivering complex infrastructure projects including across safety, quality and cost control disciplines.
Peter’s key projects include:
Australia Avenue/Underwood Road Intersection Upgrade – Peter was Construction Advisor for Roads and Maritime Services (RMS) (now Transport for NSW (TfNSW)) and was engaged during the second stage, following CJC’s initial contract. This role included reviewing six proposed options and providing constructability advice and reviewing existing Homebush Bay Drive pier relocation technical advice.
Parramatta Light Rail – As Senior Project Engineer for Ventia Peter was responsible for safety, quality, cost, Contractor and subcontractor management and work sequencing.
Thames Tideway Tunnel East, London, UK – Peter was Senior Project Engineer for Costain Vinci and Bachy Soletanche Joint Venture (CVBJV) with responsibility for safety, quality, cost, works sequencing and temporary works for the Chambers Wharf (main tunnel drive). He also led a team of section and Site Engineers.