West Gate Tunnel Melbourne

Overview The West Gate Tunnel Project will deliver a vital alternative to the West Gate Bridge, providing a much needed second river crossing, quicker and safer journeys and remove thousands of trucks from residential streets. CJC’s role encompasses several key roles and responsibilities as part of the Surface Works Delivery including Senior Delivery Director, Commercial, […]
Western Harbour Tunnel and Beaches Link

Overview The Western Harbour Tunnel will connect to WestConnex at the Rozelle Interchange, cross under Sydney Harbour between the Birchgrove and Waverton areas and connect with the Warringah Freeway at North Sydney. As part of the project, the Warringah Freeway Upgrade will make the road safer and more efficient. This project is valued at $12.5 […]
M7 Widening and M12 Interchange

Overview The project includes the widening of 23km of the M7 Motorway between Richmond Road and the M5 Motorway and the construction of a new interchange to connect to the proposed M12 Motorway. Works included the widening of over 40 bridge structures, several of which were similar in structure type to the Commonwealth Ave Bridges. […]
Mascot Tunnels Mechanical and Electrical (M&E) Upgrade

Scope RMS (now TfNSW) upgraded the existing electrical supply and utilities within the Mascot Tunnel complex along General Holmes Drive, underneath the Sydney Airport north-south runway and taxiways. The upgrade consists of works on both eastbound and westbound tunnels. RMS engaged CJC to undertake a constructability assessment on three concept design options for the upgrade […]
King Georges Road Stage 1

Scope The proposed Project, King Georges Road Stage 1 (KGR Stage 1), will generally involve widening a 1.2 kilometre length of King Georges Road to provide three lanes in each direction, improving drainage and improving safety through construction of median and wire rope barrier to separate northbound and southbound traffic. As part of the scope, […]
M6 Extension Stage 1

Scope The M6 Extension Stage 1 project will provide a motorway standard link between the New M5 at Arncliffe and the existing M1 Princes Motorway at Loftus. It will connect St George, Sutherland Shire and the Illawarra regions to the Sydney Motorway network. The 3.8km section provides the critical link to the major gateways […]
Inland Rail Grade Separating Road Interfaces

Scope The Australian Rail Track Corporation (ARTC) Inland Rail project is the upgrade of the freight rail network from Melbourne to Brisbane via Victoria, New South Wales, and Queensland. As part of the Inland Rail Grade Separation Program, Transport for NSW is currently investigating the grade separation of 22 sites where existing highways interface […]
Great Western Highway

Scope Transport for New South Wales has engaged CJC Management to provide constructability advice to the Great Western Highway Upgrade East Project. The Project is made up of two sections, namely Katoomba to Medlow Bath and Medlow Bath to Blackheath. It is understood that the current intention is for the K2M and M2B sections to […]
Easing Sydney’s Congestion M4 Smart Motorway Stage 3

Scope The NSW Government is investing $470 million to build the M4 Smart Motorway project which includes a 35km upgrade along the M4 Motorway from Lapstone to Mays Hill. When complete, the project will provide a tailored technology solution to create a better travelling experience for motorists and a more consistent journey. Smart Motorways […]
Sydney Gateway Program Peer Review

Scope The Sydney Gateway Project comprises new and upgraded road and rail infrastructure located at the Sydney Airport and Port Botany precincts. This new infrastructure will improve freight capacity on the Port Botany rail line and link WestConnex to Sydney Airport and Port Botany; Australia’s two largest international gateways. The review focuses primarily on construction […]
WestConnex Stage 1A M4 Widening

Scope WestConnex Stage 1 M4 Widening involved building an additional lane in each direction on the M4 Motorway, between Parramatta and Homebush. The project is approximately 7.5km long. The responsibilities of our team included implementation of risk management project controls, project preparation and readiness, interface management with utilities providers and stakeholders, review of the design against […]
Alexandria to Moore Park Connectivity Upgrade

Scope The Alexandria to Moore Park road corridor currently serves the function of a southern CBD priority bypass route aimed at reducing congestion within the CBD. Proposed road capacity and access improvements, as part of the Alexandria to Moore Park Connectivity Upgrade project, will reduce existing congestion and support substantial nearby urban renewal and transport […]