Mascot Tunnels Mechanical and Electrical (M&E) Upgrade

Scope RMS (now TfNSW) upgraded the existing electrical supply and utilities within the Mascot Tunnel complex along General Holmes Drive, underneath the Sydney Airport north-south runway and taxiways. The upgrade consists of works on both eastbound and westbound tunnels. RMS engaged CJC to undertake a constructability assessment on three concept design options for the upgrade […]

King Georges Road Stage 1

Scope The proposed Project, King Georges Road Stage 1 (KGR Stage 1), will generally involve widening a 1.2 kilometre length of King Georges Road to provide three lanes in each direction, improving drainage and improving safety through construction of median and wire rope barrier to separate northbound and southbound traffic. As part of the scope, […]

M6 Extension Stage 1

Scope The M6 Extension Stage 1 project will provide a motorway standard link between the New M5 at Arncliffe and the existing M1 Princes Motorway at Loftus. It will connect St George, Sutherland Shire and the Illawarra regions to the Sydney Motorway network.   The 3.8km section provides the critical link to the major gateways […]

Inland Rail Grade Separating Road Interfaces

Scope The Australian Rail Track Corporation (ARTC) Inland Rail project is the upgrade of the freight rail network from Melbourne to Brisbane via Victoria, New South Wales, and Queensland.   As part of the Inland Rail Grade Separation Program, Transport for NSW is currently investigating the grade separation of 22 sites where existing highways interface […]

Great Western Highway, NSW

Scope Transport for New South Wales has engaged CJC Management to provide constructability advice to the Great Western Highway Upgrade East Project. The Project is made up of two sections, namely Katoomba to Medlow Bath and Medlow Bath to Blackheath.  It is understood that the current intention is for the K2M and M2B sections to […]

Osborne Naval Shipyard Project

Scope Infrastructure development at the Osborne Naval Shipyard aims to modernise ship construction systems and processes in Australia to improve shipyard productivity and reduce the cost of Australian build programs. CJC personnel undertook constructability assessments of the proposed car park, pedestrian footbridge and wharf facilities. Following engagement of a subcontractor for these works, CJC undertook […]

Easing Sydney’s Congestion M4 Smart Motorway Stage 3

Scope The NSW Government is investing $470 million to build the M4 Smart Motorway project which includes a 35km upgrade along the M4 Motorway from Lapstone to Mays Hill. When complete, the project will provide a tailored technology solution to create a better travelling experience for motorists and a more consistent journey.   Smart Motorways […]

Sydney Gateway Program Peer Review

Scope The Sydney Gateway Project comprises new and upgraded road and rail infrastructure located at the Sydney Airport and Port Botany precincts. This new infrastructure will improve freight capacity on the Port Botany rail line and link WestConnex to Sydney Airport and Port Botany; Australia’s two largest international gateways. The review focuses primarily on construction […]

Stockton Bridge Half Joint Rehabilitation

Scope Stockton Bridge is located over the north arm of the Hunter River, near Newcastle in NSW. Built in 1971, it is a concrete box girder bridge with an overall length of 1,023m. In 2007, the bearings were replaced in the two half-joints and monitoring of the structure has continued since. From 2016, a design […]

Sydney Harbour Bridge Arch Maintenance Units (AMU)

Scope RMS (now TfNSW) is proposing the replacement of the four existing Arch Maintenance Units (AMU) on the Sydney Harbour Bridge. The dated AMUs are to be replaced with new infrastructure consisting of two cranes at each end that span between the top chords of the bridge.   The works are needed to provide safe […]

Sydney Harbour Bridge Step Free Access

Scope As part of the Sydney Harbour Bridge Step Free Access project, Roads and Maritime Services (RMS) carried out extensive work to investigate preferred locations for lift access. Considerations included the heritage value, accessibility standards, visual impacts and integration with the existing structure. Following this work and completion of the project, the lifts now provide […]

WestConnex Stage 1A M4 Widening

Scope WestConnex Stage 1 M4 Widening involved building an additional lane in each direction on the M4 Motorway, between Parramatta and Homebush. The project is approximately 7.5km long. The responsibilities of our team included implementation of risk management project controls, project preparation and readiness, interface management with utilities providers and stakeholders, review of the design against […]

Download PDF

Fill in the form below to download your copy of our General Capability Statement.

General Capability Form