Central West Pumped Hydro

CJC Management - Central West Pumped Hydro

Overview The Central West Pumped Hydro ECI involved design, planning and pricing the construction of a 325MW electrical generation and storage facility, with the ability to generate 2,600MWh of energy and provide power to more than 153,000 homes.​ ​ The project included the design of access roads and water supply infrastructure, upper and lower reservoirs, […]

Hunter Power Project

CJC Management - Hunter Power Project

Overview The Hunter Power Project is a critical state significant infrastructure project and includes the design and construction of a 660MW gas fired power station. The power station comprises of two heavy-duty, open cycle gas turbines. The turbines will be able to operate on natural gas and hydrogen and provide critical firming energy infrastructure for […]

The Transport Access Program (TAP)

CJC Management - Transport Access Program

Overview Provide temporary works design to support The Transport Access Program (TAP) in delivering a better experience for public transport customers across NSW by providing accessible, modern, secure and integrated transport. CJC’s Role CJC’s design team was engaged as the sub-consultant to main consultant, Arcadis in the design of temporary works for the construction of […]

Sydney Metro Northwest

CJC Management - Sydney Metro Northwest

Overview A 4km elevated rail viaduct culminating in a 270m curved cable stay bridge, constructed from pre-cast concrete segments and placed with 2 overhead gantries. Works also included 2 large cuttings and station platforms.​ The project is valued at $12.5 billion. CJC’s Role Provision of a multi-disciplinary team across all areas of construction. In particular, […]

Sydney Metro

CJC Management - Sydney Metro under Construction

Overview The Skytrain takes the Sydney Metro above ground for four kilometres, between Kellyville and Rouse Hill, is between 10-13m above ground level and is supported by 112 concrete piers.​ The project is valued at $12.5 billion. CJC’s Role CJC’s responsibilities included expert advice on the pre-cast concrete operations, construction of the cable stayed bridge […]

Project Energy Connect

CJC Management- Project Energy Connect, SA & NSW

Overview The high voltage electricity interconnector, collectively known as EnergyConnect, involves the design and construction of high voltage transmission lines from the South Australian border to Wagga Wagga, 710 kilometres in length, major substation construction at Buronga and Dinawan and station upgrades at Wagga Wagga and Red Cliffs. CJC worked as part of the pre-contracts […]

Bluff Bridge Crossing Upgrade

CJC Management - Bluff Bridge Crossing Upgrade Hero Image

Overview  CJC Management Services developed and delivered the structural design and documentation for the new Bluff Bridge over the Orara River. This project replaces the existing timber road bridge that was built in circa 1905 and is nearing the end of its service life, which was prone to frequent flooding, with a modern Super T-Girder […]

M6 Extension Stage 1

Scope The M6 Extension Stage 1 project will provide a motorway standard link between the New M5 at Arncliffe and the existing M1 Princes Motorway at Loftus. It will connect St George, Sutherland Shire and the Illawarra regions to the Sydney Motorway network.   The 3.8km section provides the critical link to the major gateways […]

Sydney Gateway Program Peer Review

Scope The Sydney Gateway Project comprises new and upgraded road and rail infrastructure located at the Sydney Airport and Port Botany precincts. This new infrastructure will improve freight capacity on the Port Botany rail line and link WestConnex to Sydney Airport and Port Botany; Australia’s two largest international gateways. The review focuses primarily on construction […]

Stockton Bridge Half Joint Rehabilitation

Scope Stockton Bridge is located over the north arm of the Hunter River, near Newcastle in NSW. Built in 1971, it is a concrete box girder bridge with an overall length of 1,023m. In 2007, the bearings were replaced in the two half-joints and monitoring of the structure has continued since. From 2016, a design […]

Australia Avenue & Homebush Bay Drive Intersection Upgrade

Scope Transport for NSW (TfNSW) is proposing to upgrade the intersection of Australia Avenue, Homebush Bay Drive and Underwood Road. This roundabout is one of the four gateway intersections providing access between the arterial road network and the Sydney Olympic Park precinct.   The idea of relocating an existing Homebush Bay Drive pier was proposed to […]

Download PDF

Fill in the form below to download your copy of our General Capability Statement.