Sydney Metro West – Central Tunnelling Package

Overview Sydney Metro West includes the construction of twin 11-kilometre metro railway TBM tunnels from The Bays to Sydney Olympic Park and excavation and civil works for five new stations at The Bays, Five Dock, Burwood North, North Strathfield and Sydney Olympic Park. The project is valued at $2 billion. CJC’s Role CJC was engaged […]
Sydney Metro West – Eastern Tunneling Package

Overview Sydney Metro West works is across three key packages to construct the civil tunnels and shafts of the metro. The Eastern Tunnelling Project is the section from The Bays to Hunter Street CBD, with the line running through Pyrmont. It also includes the construction of the station boxes at Pyrmont and Hunter Street in […]
Sydney Metro Northwest

Overview A 4km elevated rail viaduct culminating in a 270m curved cable stay bridge, constructed from pre-cast concrete segments and placed with 2 overhead gantries. Works also included 2 large cuttings and station platforms. The project is valued at $12.5 billion. CJC’s Role Provision of a multi-disciplinary team across all areas of construction. In particular, […]
Sydney Metro

Overview The Skytrain takes the Sydney Metro above ground for four kilometres, between Kellyville and Rouse Hill, is between 10-13m above ground level and is supported by 112 concrete piers. The project is valued at $12.5 billion. CJC’s Role CJC’s responsibilities included expert advice on the pre-cast concrete operations, construction of the cable stayed bridge […]
Mascot Tunnels Mechanical and Electrical (M&E) Upgrade

Scope RMS (now TfNSW) upgraded the existing electrical supply and utilities within the Mascot Tunnel complex along General Holmes Drive, underneath the Sydney Airport north-south runway and taxiways. The upgrade consists of works on both eastbound and westbound tunnels. RMS engaged CJC to undertake a constructability assessment on three concept design options for the upgrade […]
King Georges Road Stage 1

Scope The proposed Project, King Georges Road Stage 1 (KGR Stage 1), will generally involve widening a 1.2 kilometre length of King Georges Road to provide three lanes in each direction, improving drainage and improving safety through construction of median and wire rope barrier to separate northbound and southbound traffic. As part of the scope, […]
M6 Extension Stage 1

Scope The M6 Extension Stage 1 project will provide a motorway standard link between the New M5 at Arncliffe and the existing M1 Princes Motorway at Loftus. It will connect St George, Sutherland Shire and the Illawarra regions to the Sydney Motorway network. The 3.8km section provides the critical link to the major gateways […]
Easing Sydney’s Congestion M4 Smart Motorway Stage 3

Scope The NSW Government is investing $470 million to build the M4 Smart Motorway project which includes a 35km upgrade along the M4 Motorway from Lapstone to Mays Hill. When complete, the project will provide a tailored technology solution to create a better travelling experience for motorists and a more consistent journey. Smart Motorways […]
Sydney Gateway Program Peer Review

Scope The Sydney Gateway Project comprises new and upgraded road and rail infrastructure located at the Sydney Airport and Port Botany precincts. This new infrastructure will improve freight capacity on the Port Botany rail line and link WestConnex to Sydney Airport and Port Botany; Australia’s two largest international gateways. The review focuses primarily on construction […]
Sydney Harbour Bridge Arch Maintenance Units (AMU)

Scope RMS (now TfNSW) is proposing the replacement of the four existing Arch Maintenance Units (AMU) on the Sydney Harbour Bridge. The dated AMUs are to be replaced with new infrastructure consisting of two cranes at each end that span between the top chords of the bridge. The works are needed to provide safe […]
Sydney Harbour Bridge Step Free Access

Scope As part of the Sydney Harbour Bridge Step Free Access project, Roads and Maritime Services (RMS) carried out extensive work to investigate preferred locations for lift access. Considerations included the heritage value, accessibility standards, visual impacts and integration with the existing structure. Following this work and completion of the project, the lifts now provide […]
WestConnex Stage 1A M4 Widening

Scope WestConnex Stage 1 M4 Widening involved building an additional lane in each direction on the M4 Motorway, between Parramatta and Homebush. The project is approximately 7.5km long. The responsibilities of our team included implementation of risk management project controls, project preparation and readiness, interface management with utilities providers and stakeholders, review of the design against […]