Mascot Tunnels Mechanical and Electrical (M&E) Upgrade

Scope RMS (now TfNSW) upgraded the existing electrical supply and utilities within the Mascot Tunnel complex along General Holmes Drive, underneath the Sydney Airport north-south runway and taxiways. The upgrade consists of works on both eastbound and westbound tunnels. RMS engaged CJC to undertake a constructability assessment on three concept design options for the upgrade […]

King Georges Road Stage 1

Scope The proposed Project, King Georges Road Stage 1 (KGR Stage 1), will generally involve widening a 1.2 kilometre length of King Georges Road to provide three lanes in each direction, improving drainage and improving safety through construction of median and wire rope barrier to separate northbound and southbound traffic. As part of the scope, […]

M6 Extension Stage 1

Scope The M6 Extension Stage 1 project will provide a motorway standard link between the New M5 at Arncliffe and the existing M1 Princes Motorway at Loftus. It will connect St George, Sutherland Shire and the Illawarra regions to the Sydney Motorway network.   The 3.8km section provides the critical link to the major gateways […]

Easing Sydney’s Congestion M4 Smart Motorway Stage 3

Scope The NSW Government is investing $470 million to build the M4 Smart Motorway project which includes a 35km upgrade along the M4 Motorway from Lapstone to Mays Hill. When complete, the project will provide a tailored technology solution to create a better travelling experience for motorists and a more consistent journey.   Smart Motorways […]

Sydney Gateway Program Peer Review

Scope The Sydney Gateway Project comprises new and upgraded road and rail infrastructure located at the Sydney Airport and Port Botany precincts. This new infrastructure will improve freight capacity on the Port Botany rail line and link WestConnex to Sydney Airport and Port Botany; Australia’s two largest international gateways. The review focuses primarily on construction […]

Sydney Harbour Bridge Arch Maintenance Units (AMU)

Scope RMS (now TfNSW) is proposing the replacement of the four existing Arch Maintenance Units (AMU) on the Sydney Harbour Bridge. The dated AMUs are to be replaced with new infrastructure consisting of two cranes at each end that span between the top chords of the bridge.   The works are needed to provide safe […]

Sydney Harbour Bridge Step Free Access

Scope As part of the Sydney Harbour Bridge Step Free Access project, Roads and Maritime Services (RMS) carried out extensive work to investigate preferred locations for lift access. Considerations included the heritage value, accessibility standards, visual impacts and integration with the existing structure. Following this work and completion of the project, the lifts now provide […]

WestConnex Stage 1A M4 Widening

Scope WestConnex Stage 1 M4 Widening involved building an additional lane in each direction on the M4 Motorway, between Parramatta and Homebush. The project is approximately 7.5km long. The responsibilities of our team included implementation of risk management project controls, project preparation and readiness, interface management with utilities providers and stakeholders, review of the design against […]

Sydney Yard Access Bridge

Scope The Sydney Yard Access Bridge project was the first early and enabling works package of the NSW Government’s Sydney Metro City & Southwest project. The 130m long bridge crosses five intercity lines that had never been closed under a single possession. While a full closure was planned, the main girders and cross girders were […]

Alexandria to Moore Park Connectivity Upgrade

Scope The Alexandria to Moore Park road corridor currently serves the function of a southern CBD priority bypass route aimed at reducing congestion within the CBD. Proposed road capacity and access improvements, as part of the Alexandria to Moore Park Connectivity Upgrade project, will reduce existing congestion and support substantial nearby urban renewal and transport […]

Sydney Airport 5-Year Airfield Capex Planning

Scope Our Airports team was engaged to provide independent advice on the current 5-year Airfield CAPEX Plan. We provided Subject Matter Expert advice on their airfield pavements. The output of this work will be used as supporting information for Aeronautical Agreement to lock in the Airfield Pavement Capital Works for the next 5 years. CJC […]

Sydney Airport Civil Assets

Scope CJC Management were engaged by Sydney Airport Corporation Limited to develop a Civil Assets Manual, provide ad-hoc friction testing training, and technical advisory services across the entire airfield. A further document which covers Friction Management at the Airport was requested as part of the scope. This included training and induction into friction management activities. […]